NAF 43.12G—Earthwork currents and preparatory work
Subclass · Nomenclature d'Activités Française (2025)
Where 43.12G sits
- F Construction
- 43 Specialized construction work
- 43.1 Demolition and site preparation
- 43.12 Work site preparation
- 43.12G Earthwork currents and preparatory work
What 43.12G includes
- Clearing of building sites
- The work of dérochement, destruction of the explosive
- Current works-earthwork (for example digging, filling, grading of construction sites)
- The common work of digging trenches, including the use of explosives by micro-blasting and the performance of horizontal wells for the passage of cables and pipes (roads and various networks, pipelines, urban, etc)
- The clearing and filling of construction sites
- Site preparation for mining, except oil and gas sites located
- The removal of overburden and the shaping of the land on the construction
- Drainage construction sites
- Drainage of agricultural land and forestry
What 43.12G excludes
43.12G in other systems