NAFSubclass
NAF 43.12H—Earthworks specialist or high-mass
Subclass · Nomenclature d'Activités Française (2025)
Where 43.12H sits
- F Construction
- 43 Specialized construction work
- 43.1 Demolition and site preparation
- 43.12 Work site preparation
- 43.12H Earthworks specialist or high-mass
What 43.12H includes
- Construction of large mass prior to the construction of means of communication: Roads and highways, railways, canals, etc
- Work and the use of explosives for earthworks rocky channels of communication open-pit or underground
- Site preparation for mining
- The preparation of these sites for archaeological excavation
- The drawdown of aquifers and other techniques to fight against the infiltration of water in the foundation.
What 43.12H excludes
- The drilling of wells, extraction of oil or gas, see 06.10Y and 06.20Y
- Surveys of test, associated with the extraction of oil or gas, see 09.10Y
- Support services for surveys, test and cut-outs (for example associated with mining, see 09.90Y
- The decontamination of soil, see 39.00Y
- The drilling of water wells, see 42.21Y
- The shaft sinking, see 43.50Y
43.12H in other systems
Looking up equivalents…