NAFSubclass

NAF 43.12HEarthworks specialist or high-mass

Subclass · Nomenclature d'Activités Française (2025)

Where 43.12H sits

  1. F Construction
  2. 43 Specialized construction work
  3. 43.1 Demolition and site preparation
  4. 43.12 Work site preparation
  5. 43.12H Earthworks specialist or high-mass

What 43.12H includes

  • Construction of large mass prior to the construction of means of communication: Roads and highways, railways, canals, etc
  • Work and the use of explosives for earthworks rocky channels of communication open-pit or underground
  • Site preparation for mining
  • The preparation of these sites for archaeological excavation
  • The drawdown of aquifers and other techniques to fight against the infiltration of water in the foundation.

What 43.12H excludes

  • The drilling of wells, extraction of oil or gas, see 06.10Y and 06.20Y
  • Surveys of test, associated with the extraction of oil or gas, see 09.10Y
  • Support services for surveys, test and cut-outs (for example associated with mining, see 09.90Y
  • The decontamination of soil, see 39.00Y
  • The drilling of water wells, see 42.21Y
  • The shaft sinking, see 43.50Y

43.12H in other systems

Looking up equivalents…