KBLISubclass

KBLI 43223—Gas Distribution Network Installation

Subclass · Klasifikasi Baku Lapangan Usaha Indonesia (2025)

Where 43223 sits

  1. F Construction
  2. 43 Special Construction
  3. 432 Installation of Electrical Systems, Water (Pipe), and Other Construction Installations
  4. 4322 Installation of Water Lines (Plumbing), Heating and Air Conditioning
  5. 43223 Gas Distribution Network Installation

What 43223 includes

  • The activities of installing and maintaining gas networks, including fuel gas and medical gas, in residential and non-residential buildings and other civil buildings.

What 43223 excludes

  • Construction of oil and gas networks for long-distance transport, see subclass 42991;
  • Installation of pipes and machinery in chemical plants, refineries and the like for processing or not related to heating, ventilation and air-conditioning (HVAC), see class 3320.

43223 in other systems

ANZSICAustralia · New Zealand
ICNEAChina
ISICUnited Nations (global)
JSICJapan
NACEEuropean Union
NAICSUnited States
SICUnited States (legacy)

Hover a badge to see the evidence source. How our conversions work →