SBIClass

SBI 43.22—Plumbing, heat and air-conditioning installation

Class · Standaard Bedrijfsindeling (2025)

Where 43.22 sits

  1. F Construction
  2. 43 Specialised construction activities
  3. 43.2 Electrical, plumbing and other construction installation activities
  4. 43.22 Plumbing, heat and air-conditioning installation

Contains 2 narrower codes

What 43.22 includes

  • This class covers the installation, repair, and maintenance of water supply, drainage, heating, and air conditioning systems, including extensions and modifications thereof.
  • Installation, maintenance, and repair of: • heating systems, such as heat pumps, solar collectors • incinerators, cooling towers • plumbing and sanitary work • equipment and ducts for ventilation and air conditioning • gas installations • steam pipes • sprinklers e.g. (fire extinguishing systems and lawn sprinklers)
  • Construction or installation of tiled stoves
  • Installation of air ducts
  • Installation of medical gas distribution systems in hospitals

What 43.22 excludes

  • Installation of electric skirting board heating, see 4321
  • Camera inspections of air ducts, water and gas pipes and pipes for other fluids, not in connection with repair or installation, see 7120

43.22 in other systems

ANZSICAustralia · New Zealand
ATECOItaly
CNAESpain
ICNEAChina
NACEEuropean Union
NAFFrance
NOGASwitzerland
SCIANMexico
SICUnited States (legacy)
SNISweden
UK SICUnited Kingdom
WZGermany

Hover a badge to see the evidence source. How our conversions work →